From: route@monster.com
Sent: Saturday, April 16, 2016 2:04 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Edward Clifton 4213 Flanders St. Denver, C0. 80249 Email:clifton746@aol.com POSITION
OBJECTIVE: Seeking
a challenging position in which I can utilize my skills in a formal a
fashion. In which I can bring great success to the company and myself.
Training will also be fully utilized. The position must offer opportunities
for professional development. Ericsson GSM
RBS TDMA, UMTS installation/commissioning RT2 Nokia BTS
installation/commissioning Nokia flexi
installation/commissioning and Integration Nortel-GSM
Installation/commissioning RT2
UMTS-installation/integration RTU2 Nokia Lte certified
with PTID. Strengths • Process Improvement. • Excellent oral and written communication
skills. • Proven ability to reach goals. • Excellent customer service skills. •
Detail-oriented. EMPLOYMENT HISTORY: Jan 2014-Apr 2015 Markets: Denver T-mobile (Wavsys) –contractor/Direct Field tech Responsibilities ·
Installing
Fsme’s, Esmb, Esmc, Fsmf,Fsmd and Fsmb for system modules. I also installed
transport t1/Ethernet cards for respected modules. ·
Installed
numerous radios(Fria,Frie,Frlg,Fsmb/Fsmc with 1900 Pcs and 2100 Aws
technologies. ·
Understand
Mops and Rfds blueprints on each technology. ·
Troubleshooting
different technologies which sometimes included fiber testing, using volts
meters, pim testing and sweeping lines. ·
Troubleshooting
requirements might been using fiber cleaners, changing out different sfp’s
for fiber connections. Using t1/Ethernet testers such as Real world
certifiers. Might have O&M fiber testers and Artizu equipment to test rf.
lines. ·
Maintain
Audits on sites which instilled cleaning sites looking for missing inventory
or simply required equipment being replace at site that was broken ·
Consolidated
Nortel s8000 and S12000 cabinets for construction. Also decommissioned
equipment at sites. ·
Installed
/program 7705 Sar-M and Sar F routers. ·
Wired up
external alarms at site and programmed Delta 502/503 power cabinets and Alpha
rectifier shelves. ·
Gave
assistance to other field techs/construction crews on projects that needed to
be completed at a high demand. ·
Installed
Nokia FBBA,FBBC and FRLB’s for 700mhz technology ·
Call tested
sites on 911, U1900,U2100 and LTE technology ·
Modernized
over 100 sites in market. ·
Use the
T-mobile Homer database to check troubleshooting tickets everyday and work
orders. ·
Jan-2012-2013 T-MOBILE/Us. Celluar- Wavsys-(FM, MODERATION LEAD TECH., LTE LEAD
TECH, TIGER TEAM) Markets-Minnesota, Missouri, Denver, and Detroit markets ·
Installing
Fsme’s, Esmb,Esmc,Fsmf for system modules. ·
Installing
Lte Gps and sync cables that were provided. ·
Test fiber
and troubleshooting fiber in the Covp’s (top & bottom) ·
Integrate
RF sharing and dedicated sites for many different config. ·
Troubleshooting
top and bottom fibers that are install for system modules and radios. ·
Reading and
understanding Port matrix’s and RFDS. ·
Making and
testing equipment by making call test, 911 tests, and using speed test to get
data results. Using galaxy note 2 phones, and 2g and 3g phones. ·
Manage
crews of 2 (7 crews in total). Understanding and getting what my crews needed
to perform quality and suffient work. ·
Had daily
and weekly conference calls with T-mobile and NSN to go over issues in
markets. ·
Perform cut
over’s with 7705’s, Cisco’s, 311v, Ciena, LMU, Axxius equipment. ·
Perform hot
cuts with the bridge, Gdc, and gathered 48 alarms reports for closeout info. ·
Uploaded
closeout into, dropbox, filesanywhere, and IPM servers. ·
Gave
support to my techs round the clock so could perform suffient. ·
Integrated
& commissioned sites on U1900,U2100,and 700 technology Nsn (T-MOBILE-Wavsys) - June 2011 Lead Tech Lte Certified Aug-11 – Apr. 12 (T-mobile) Lead Tech. Denver, Detroit, Houston 1.
1.Installed 7705 Alcatel/lucent routers 2.
Team lead for cut-over crew during maitence 3.
Cut over 2g circuits for Nortel/Nokia ultra to Siad. 4.
Lead over 5 techs and make nightly schedules for deployment and
support techs with issues as far as cutovers. 5.
Install cat 6 /cat 5 cables from Nobe b (nokia flexi) if2 eif3 ports. 6.
Call the war room to make sure site is pinging 7.
Installed cables for the Jdsu (nid) and troubleshoot NId’s to make
sure there up and have not brought the Node b down 8.
Run script for said using T-mobile drop box program 9.
Pm over 10 guys and assist them with troubleshooting issues AT&T-
CORTEL (Tiger Mobility) Dec.2010- Aug. 2011 San Diego, Ca. Los Angeles,
Ca. Phoenix, Az Albuquerque,
Nm.
Team lead. 1.
Schedule assignments to techs. 2.
Installed Cisco 2941 & Alcatel/lucent 7705 Sar 8 routers 3.
Installed Uam’s for Ciena boxes. (optical) 4.
Installed 10g fiber for Routers and Ciena (3911) Time Warner Routers,
& Verizon 311v 5.
Installed Etmfx-11 cards for 3106,3418,3518,3206 Ericsson cabinets.
Also loaded Generic Script for these cards so that PCO could load cards at
maitience windows. These will be installed with the cisco routers. 6.
7705 routers were terminated by running Ethernet to LIU port on the
URC card On the Alcatel/Lucent card. 7.
Troubleshoot sites for routers being down which can take down equipment,
Also loaded scripts for Routers and trouble-shooted fiber/cat 5 that were
installed with the routers 8.
Loaded scripts using ACAT program which was given by AT&T and
uploaded script to see if site will ping. 9.
Installed fiber and ran fiber from 6000 series Lte Ericsson 10.
Did cutover’s for Cisco 2941 to ALU 9500 routers for Microwave sites
and trouble-shooted issues. (T-mobile
Wavsys)-Denver, Co.- March-10 to Aug. 10. HSPA-
INSTALLATION AND COMMISSIONING 1.
1. Installed FSMB on stack cabinets, FCOA cabinets, H-Frames, Pole
mounts. 2.
Took captures before &after. After script run 3.
Called into war room to check for alarms before and after. 4.
Called test site on alpha, beta, and gamma sectors. 5.
When making call test check for data, text, and placing in and out
calls. Also made e-911 checks on each sector. 6.
Files that were used for script runs were 7.
Installed Jdsu in Nortel cabinet (nid) and also ran Ethernet (cat 6)
and terminated ends. OCT. 09’-
12-24-10 Tellab-(AIM TECHNICAL) SIAD 8605 3G/4G 1. INSTALL Siad with DS3 cables
(fiber cabels) for Lucent Node B 2. Install 14 T1’s to D-mark for
Siad expansion of UMTS circuits 3. Also communicated with AT&T
and Civil on survey info. 4. Supported site Migration with
Tellabs, ALU., And AT&T for Site Cutovers 5. Loaded config. packages for
Siad 8605 for Migration. Also help Lucent with installing DS3 card and Hatch
plate for ds3 ports. Also help with loading the Generic for the new Ds3 card
and did troubleshooting. AT&T –June –Sept 09
RBS. Lead Field Tech- E911 1.
Install True Position E911 LMU (Location Measuring Unit) 2.
Commission sites for cutover for going Phase II 3.
Ran various loop back test for t1 connectivity to establish an SMLC
link 4.
Took pictures, surveys and captures to close out packages for sites to
be billable 5.
Programmed also various CSU’S (AXXIUS 800,Adit 600, KENTROX CROSSPATH
and cascaded sites on Ericsson)for LMU to get SMLC link 6.
Installed LMU in S8000,S12000 and Ericsson 2106 and 2106I,2206 7.
Installed GPS. cone, cables and Connectors for install also took lat.
And long. Coordinates and imported this data into LMU for correct location. 8.
Also on call with AT&T tech for support for night cutovers. 9.
(AT&T wireless & VERIZION Field Sup. July-08 to present Oklahoma City, Ok Phoenix, AZ SANTE’ Fe, NM Little Rock, AR Chicago, Il. 1.
Ran a team of 7 techs. Decommission of T.D.M.A (Lucent& Nortel)
cabinets. 2.
Was responsible for keeping a daily tracker of sites that were
decommissioned. 3.
Made sure teams had the proper tools for getting jobs completed. 4.
Was responsible for making sure old radios and equipment were scanned. 5.
Made sure cabinets were powered down correctly and cables were removed
from cabinets properly. 6.
Cleared out any existing alarms that were cause removal team on
1900/850 Nokia GSM cab. 7.
Cleared out any L.M.U issues from removing cables from the T.D.M.A
side to the Nokia side. Also ran a bit 6 test on L.M.U to confirm db’s were
at the proper spectra. (T-mobile) Long Island, NY Perform site audits and inspections on Ericsson
3206 and 3106 and 3418 and 3518 Loaded scripts on Ericsson UMTS using Element
manager(EMAS). Ran also multiple T1’s for Node B for the ET-MI
card Made T-1’s and t-1 testing on the UMTS Also Cleared out trouble tickets on the 2g side
of Nortel 12000, 8000, 18000 series. Plus any alarm’s that occurred on any
UMTS Ericsson Node B side. Also did integration on new sites UMTS Second Integration on the 850 combined with
the 1900 Ran also sweeps on lines using site-master
(ARITZU) Changed out TMA when lines where flat line from
sweeps on lines. Also use a T-Bird when T1 needed to be tested
with Switch. Ran various test for Down link issues, radio’s,
uplink ,and clearing alarms that might occur. Also gave T-mobile techs support on closeouts for
UMTS and running 24hr sweeps on Alpha, Beta, Gamma sectors. Installed weather kits for sites that were down
and any LMU and CSU issues such as making sure correct timeslots are in place
and making sure LMU’s were not down. Also check down tilts using Andrew (ATC200 Lite)
program. We’re required to change tilts manually or by using this program. A.D.T Security-Genesis Networks(Goodman Networks) Field Tech Installed 3055-I and TG-4 digital units. 1. Trouble Shoot alarm panels for
Telco alarms, panic alarms, and any keypad issues. 2. Made sure Analog unit was
disable and digital unit was responding properly. 3. Ran various tests with A.D.T
tech. support to verify unit was sending off signals. 4. Made sure keypad was responding
to digital units. 5. Open and Close tickets to take
off test and on test. 6. Verified if units were a backup
unit or primary unit. 7. Made sure if it was a backup
unit to make sure the biscuit and pins had dial tone using butt set. 8. Work on various alarm products Ademco,
Honeywell, Ranger American. 9. Able to read blue prints and schematic sheets. 10.Allso made sure work area is clean and
customer was satisfied. COMCAST CABLE Field tech. 1. Install multiple digital boxes
for cable viewers(Hd’s, Dvr’s , Hd dvr’s, and Dct’s 2. Install modems and routers for
network purposes. 3. Set up networking with
customers 4. Disco’s and Re-connects from
the pedestal and Mdu boxes either connecting or dis- connecting. 5. Install digital phone using a
EMTA digital box connecting to phone jacks or splicing into existing phone
wires. 6. Climb 28ft. ladder to work on
tap on telephone pole. 7. Also did quality audits. GOODMAN/
GENISIS NETWORKS (traveling contractor) (5/1/2006-1/02/07)
RBS FIELD ENG. LEAD TECH. Minneapolis,
Minnesota Omaha,
Nebraska Grand Rapids,
Michigan /Indiana Boston, Mass. Des Moines,
Iowa 1. Installing and loading boot & flash files for TP. LMU 2. Commissioning the LMU. 3. Harvesting of Andrew WLS. (1900 & 850)
remove RF’s cables and GPS. Cables. 4. Drive testing with Cingular wireless on
TDMA,CDMA AND GSM phones for phase II also drive testing using Clarify
software on streets & Trips. a. Perform mobile to land origination testing and
termination testing. b. Perform *86,Evdo,611,*477, and 10 digit dial
testing. c. Always perform calls on each sector(alpha,
beta, gamma). 5. Programming
of Kentrox equipment using T1 and V.35. 6. Perform
Loop back tests. 7. Enable
ports on Carrier Access (flex master) for T1 for Lmu. 8. Perform site surveys (duties included site
data and taking pics. on everything present at site. 9. Perform site Quality audits and Validated
surveys. 10. Ran power to PDU. For LMU. 11. Also perform training and assistance to
roughly several tech. on LMU and Nokia integration. (3/27/06-5/1/06)
W.F.I. (AUAXNO WIRELESS INC. traveling contractor) Chicago,IL
(TDMA,UMTS,CDMA) Installing and programming True position LMU Commissioning the LMU Troubleshooting the LMU Taking pictures of the site before and after. Swapping out Single Band LMU and replacing them
with Dual Band Installation of Dual Band Antenna Running RF cables from old 882/884 TDMA cabinets
to the new
Ericsson 850 and 1900
cabinets
Perform Maintenance checks on sites Programming the DSU EMPLOYMENT: 1/16/06
Darwin Partners/W.T.I.S (Orlando, FL. Traveling contractor) 2/17/06
RBS Field Trueposition
1 Installing and programming Trueposition LMU 2
Commissioning the LMU
3 Perform Loop back test 4
Programming LMU and GPS coordinates
5 Perform Maintence checks on sites
6 Perform Site Survey, include collecting data and
validate data on-site
7 Check for T1 issues and GPS coordinates 8 Troubleshooting
the LMU 1/09/06Darwin Partners/W.T.I.S (Knoxville, TN.
Traveling contractor 3/15/06RBS Field Engineer Lead Tech–
Trueposition 1 Installation and
programming of Trueposition LMU 2 Loading flash &
boot files 3 Installing GPS,
Downlink Antenna, cabling and connectors 4 Commissioning LMU 5 Perform Loop back
test 6 Programming LMU
with GPS coordinates 7 Running various Bit
tests 8 Troubleshoot any
issues with LMU and/or BTS 9 Sweep lines to
collect RF data for carrier
10 Perform Site Survey, duties include taking pictures,
collect data
11 Perform Quality Audit on all work performed
12. Decommission of Nortel and Siemens
cabinets.
7/15/05 ENI
Engineering Network- True Position (Boston, MA. Traveling contractor) 12/20/05
RBS Field Eng.-Lead Tech
Installation and testing of GSM 2000 series equipment
Decommissioning old 884/882 completing edge upgrades on
(GMS 2106, 2206)
Running multiple RBS (GMS) on one or more T1
Commissioning the RBS for customers in the US
Troubleshooting any issues with LMU/BTS
Performing site surveys and picture taking Darwin Partners
(W.T.I.S)
(Greensboro, NC). 1. Decommission and removal of
2202, 2102 and 2308 cabinets for 2G of the UMTS project. 2. Installing, upgrading and
commissioning Ericsson 2106,2206, 3018, and E911 for the UMTS Node B project. 3. Cascading multiple T1 on GSM
and Integrating using OMT 4. Troubleshooting on all
external alarms or faults. 5. Managing weekly inventory on
spare parts 6. If any alarms on LMU. Clearing
out alarms. 7. Performing preventative and
corrective maintenance on RBS and all its components Education Michigan Institute of Realty (2004) Certificate of Completion of Real Estate
Course
Hamady
High School (1997) Earned diploma ·
Available on
request. References 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|